How a fabric-reinforced liquid roof membrane works

A liquid-applied roof membrane goes on by roller, squeegee or spray rather than in rolls. It follows every drain, upstand and penetration and cures into one continuous membrane. A fabric-reinforced membrane adds a layer of polyester fabric inside it, with the fabric laps bedded in resin.

This article explains what each layer of such a membrane does, using the ResinTech RMS system we install as the example. Every figure in it comes from the RMS system data sheet.

The layers

Four layers, each with one job

The RMS build, layer by layer (wet film per coat)
LayerMaterialWet filmIts job
Base coatResinTech FPU, a flexible polyurethaneAs specifiedThe first half of the waterproofing; the fabric is laid into it
ReinforcementPolyester fabric, one layer—Reinforces the membrane from inside
Second base coatResinTech FPUAs specifiedEncapsulates the fabric and completes the waterproofing
Top membraneResinTech PPM polyurea, or HPP polyasparticOne coat, up to 20 mils (PPM); as specified (HPP)Covers the base coats and protects them from sunlight

A primer is optional. On sound, dense, dry concrete it is not needed; it is used on porous, marginal or moisture-risk substrates, wherever the test patch shows it is needed, or where the project specification calls for one. A colour finish over PPM is optional too, for a set colour or gloss.

The base coats

The waterproofing is two coats of FPU

FPU is a single-component, moisture-curing polyurethane: there is no mixing of two parts on the roof. It is flexible and crack-bridging, with 800% elongation and flexibility down to −35 °C in its data sheet tests. That flexibility is the point of it: the base coats are crack-bridging and stay flexible in the cold. Expansion and active movement joints still get their own detail.

It goes on in two coats, each built to the wet film set in the specification and checked with a gauge. The drains, upstands, wall junctions, penetrations, corners and seams are done first, with FPU and fabric, before the field coats go down.

The fabric

Why the fabric sits inside the membrane

The fabric is laid into the first coat while it is still fresh and embedded until it is fully wetted out, with no wrinkles, folds or trapped air. The second coat then goes over it, either straight away, wet-on-wet as the fabric is laid, or once the first coat can be recoated, typically 8–12 hours later. Either way the fabric ends up fully encapsulated, inside the membrane rather than on top of it.

On our RMS roofs the fabric covers the whole surface, on a concrete deck and on existing roofing alike, and it is never left out at seams, laps, flashings, drains and transitions: the places where the roof changes direction or material. Fabric joints overlap at least 3 inches (75 mm) at the sides and 6 inches (150 mm) at the ends, with resin between the laps.

The top membrane

Why the base must always be covered

FPU stays tacky for days, and it is not designed to face sunlight or traffic. So it always gets a top membrane, applied once the FPU can be recoated, typically 8–12 hours after its last coat, and within 72 hours. A base left longer, or one that has picked up dirt, is cleaned and test-patched before it is top-coated.

The two top membranes (typical values from the data sheet)
PPM — standardHPP — other colours
ChemistryUV-stable polyurea, single componentPolyaspartic, two-component kit
Wet filmOne coat, up to 20 milsAs specified
ColourMedium greyTinted on site to any colour
Elongation648%20%: a hard topcoat, not a crack-bridging membrane
Drying and cureTack-free 2–3 hours, through-dry about 9 hours, full cure 24–48 hours (20 °C, 50% RH)Tack-free about 1 hour, light foot traffic 3–4 hours (a cure stage, not a traffic rating), full cure 5–7 days (23 °C, 50% RH)
The base coats do the waterproofing. The top membrane protects them.

Thickness

The wet film is the specification

A liquid membrane is only as good as the thickness it is applied at, and that is measured, not estimated. Every coat is checked with a wet-film gauge as it goes on. The specification sets maximums as well as minimums: PPM, for example, goes on in one coat of no more than 20 mils over the FPU.

After the second base coat the membrane is inspected for pinholes, voids, exposed fabric and thin spots, which are repaired before the top goes on.

Conditions

What it needs to go on

Dry, stable weather, with the roof surface at least 3 °C above the dew point and never damp, frozen or contaminated. FPU needs a surface between 5 and 35 °C during application and cure; HPP needs a surface of 10–30 °C, air of 10–32 °C and humidity no higher than 85%. A new concrete deck needs a minimum 28-day cure. An existing roof has to be sound, dry, clean and firmly bonded, and it gets an adhesion test patch before the full application.

The membrane is then kept closed to traffic and protected from rain and standing water until it cures, and the batch numbers, film builds and weather are recorded for the handover.

Limits

What it is not

It is not a traffic surface: roof terraces and walkway routes with regular foot traffic take the ResinTech PTS+ pedestrian system, and rooftop parking takes VTS-D+. It needs positive drainage, and service under ponding or standing water is not covered by the RMS data sheet. It does not bridge expansion or active movement joints on its own; they get their own detail. PPM is not a vapour barrier, and the system is not for pools, tanks, potable water or submerged service unless ResinTech approves it for that use. New wood or plywood roof decks are not covered by the RMS data sheet and are assessed first.

We install this system as our flat roof coating and restoration service. Whether your roof is a candidate is the subject of our article on restoring or replacing a commercial flat roof.

Questions we get asked

How a fabric-reinforced liquid roof membrane works: FAQs

What makes a liquid roof membrane fabric-reinforced?

A layer of polyester fabric is laid into the first base coat while it is fresh, embedded until it is fully wetted out, and encapsulated by the second base coat. The fabric ends up inside the membrane rather than on top of it.

Why does the membrane need a top coat?

The FPU base coats stay tacky for days and are not designed to face sunlight or traffic. A UV-stable top membrane, PPM or HPP, is applied once the FPU can be recoated, typically 8 to 12 hours after its last coat, and within 72 hours.

How thick is a fabric-reinforced liquid roof membrane?

It is set in the specification for the roof. In the ResinTech RMS build that is two FPU base coats with the reinforcing fabric between them, and one PPM top coat of no more than 20 mils wet. Every coat is checked with a wet-film gauge, and the film builds are recorded.

Can a liquid membrane go over an existing roof?

Over existing flat roofing that is sound, dry, clean, firmly bonded and drains, after the defects are repaired. The roof type is confirmed with ResinTech and an adhesion test patch is applied and checked first, because whether the membrane bonds to a particular roof is tested, not assumed.