Whistler · Since 2001

Epoxy and industrial floor coatings in Whistler.

Hard freeze–thaw winters, road salt carried in on every car and intense summer ultraviolet — the most demanding environment we work in.

Whistler

Freeze–thaw is a movement problem

Whistler puts concrete through something the Lower Mainland does not: repeated freezing and thawing, night after night through the winter. Water that has entered a crack expands as it freezes and levers the crack wider every single time, so a hairline that would sit stable in Vancouver for years opens quickly here. We set out the mechanism, and the detailing it calls for, in freeze–thaw and road salt on the Sea-to-Sky.

That means flexibility matters more than hardness. A membrane specified for Whistler has to stay elastic at low temperature and keep bridging cracks while the slab moves, which rules out several products that perform perfectly well at sea level.

Then there is the summer. Resort decks take intense ultraviolet at altitude, so the wear coat has to be fully aliphatic or it will amber and chalk within a season or two. And the resort calendar is unforgiving — work windows are shoulder season, which we plan around rather than negotiate.

Freeze–thaw
All winter
Wear coat
Fully aliphatic
Work window
Shoulder season

Services

What we install in Whistler

Parkade waterproofing

Traffic-bearing membranes for Whistler parkades, ramps and roof decks.

Learn more →

Industrial floor coatings

Epoxy and urethane systems for Whistler warehouses and plants.

Learn more →

Structural concrete repair

Spall and rebar repair on Whistler slabs and soffits.

Learn more →

Flat roofing

Liquid-applied restoration and torch-on roofing for Whistler flat roofs, after an inspection.

Learn more →

Flat roofing in Whistler

Whistler flat roofs, restored or replaced after an assessment.

Whistler’s winters are hard on any roof, and liquid-applied work needs dry weather and a roof surface within the products’ temperature limits, so it is planned for the warmer months. We restore sound flat roofs with the ResinTech RMS liquid-applied membrane, provide torch-on roofing where a roof has to be replaced, and inspect every roof before we price it.

The top of a planter coated in ResinTech FPU and PPM up to the building wall, the membrane still glossy

Our work in ResinTech FPU with a PPM top coat, the two products in an RMS roof, detailed up a wall and onto the slab. This is a planter, not a roof, and not a Whistler project. See the project.

System
ResinTech FPU and PPM
Work
Planter waterproofing
Location
Not recorded

Our work in Whistler

A pumpkin-orange urethane floor

In 2014 we laid a urethane floor in pumpkin orange through a commercial interior in Whistler: along the glazed partitions, through the open rooms and round every wall, masked with tape so the colour stops on a clean line against the grey concrete of the floor beyond. The finish is high gloss, with the fine texture of the urethane showing where the light catches it.

High-gloss pumpkin-orange urethane floor across an open room in Whistler, the walls masked with blue tape
Close view of the pumpkin-orange urethane floor in Whistler, with the gloss and the fine texture of the finish in the light

Whistler, 2014: the pumpkin-orange urethane across an open room, the walls still masked (left), and the gloss and texture of the finish close up (right). More on the projects page.

Setting
Commercial interior
System
Urethane, pumpkin orange
Completed
2014

Our work in Whistler

A hotel pool deck, repaired and recoated

At a hotel in Whistler we repaired and recoated the pool deck with ResinTech products while the pool and the hot tub stood drained. The old coating was ground under dust extraction, the cracks and damaged areas were filled and patched, and the new coat was rolled out across the deck, carried to the tile line at the pool edge and round the ladders and handrails.

The crew preparing a hotel pool deck in Whistler round the drained pool and hot tub, grinding under dust extraction
Cracks and damaged areas on a Whistler hotel pool deck filled and patched in grey before the ResinTech recoat

A hotel pool deck in Whistler: the crew preparing the deck round the drained pool, grinding under dust extraction (left), and the cracks and damaged areas filled and patched in grey (right).

Crew rolling the new ResinTech coat to the tile line at the edge of a drained hotel pool in Whistler
A Whistler hotel pool deck recoated with ResinTech, along the pool and the hot tub

The new ResinTech coat rolled out to the tile line at the pool edge (left), and the recoated deck along the pool and the hot tub (right). More on the projects page.

Setting
Hotel pool deck
Work
Repair and recoat
System
ResinTech

Our work in Whistler

The pool deck at Nita Lake Lodge

At Nita Lake Lodge in Whistler we coated the hotel's pool deck in the ResinTech EWS system. The grey textured finish runs across the deck to the edge of the pool and round the stainless handrails, and out to the stone wall where the cedar barrel sauna stands.

Grey ResinTech EWS coating on the pool deck at Nita Lake Lodge in Whistler, round the pool and its stainless handrails, with a cedar barrel sauna by the stone wall

The finished deck round the pool at Nita Lake Lodge. More on the projects page.

Setting
Hotel pool deck
System
ResinTech EWS
Finish
Grey, textured

Questions

What Whistler clients ask us.

Whistler has serious freeze-thaw. What does that mean for a parkade?

It means the membrane is doing harder work than the same membrane in Vancouver. Repeated freeze-thaw cycling opens cracks in concrete, and the winter salt and traction grit that arrives on every vehicle drives chlorides into the slab. Crack bridging, drainage that actually clears meltwater, and thorough detailing at joints and turn-ups matter more here than anywhere else we work.

Can work be done during ski season?

It is possible but rarely sensible for exterior and exposed work — temperature limits, occupancy at its peak, and no tolerance for disruption in a hotel or resort strata at that time of year. Most Whistler projects run in the shoulder or summer season, which is also when the substrate conditions are right. That means booking well ahead, because the workable window is short and everyone wants it.

Our resort strata has heavy short-term rental turnover. Can you work around it?

Yes, with phasing and a lot of advance communication. Buildings with nightly turnover need certainty about which stalls are available on which dates, further ahead than a residential strata does. We issue phase plans early for exactly this reason, and we would rather commit to a conservative area per phase and hit it than promise more and slip.

Do you handle heated ramps and snowmelt systems?

We work on decks that have them, and the important point is that a heated slab changes the thermal cycling the coating experiences, which affects system selection and detailing. If your ramp has a snowmelt system, tell us at the assessment — it is exactly the kind of detail that decides whether a specification is right or wrong.

Strata council? If a depreciation report flagged your parkade membrane, we wrote a full guide to what that scope involves, how it phases around residents and what your engineer will require — read it here.

Site assessments

Have a slab in Whistler you're worried about?

Photographs and a rough area are enough to start. We'll come out, test moisture, and scope it properly.

Main (604) 968-2040
Second (604) 230-0256
estimating@westpacificcoatings.com