ServicesIndustriesProjectsService areasCompanyInsightsContact

Selected work

10 million+ ft² installed across British Columbia.

A sample of recent projects, with the constraint that actually shaped each one. Most of our work is on occupied buildings, which is usually the harder problem.

Projects

Occupied buildings, phased scopes.

Every one of these was delivered without taking the building out of service. That constraint is the reason the scopes look the way they do.

Finished grey broadcast-textured traffic coating across a Canadian Tire mechanical room floor, between pump plinths and switchgearMechanical room

Canadian Tire mechanical room traffic coating

Broadcast-textured traffic coating across a working mechanical room, carried up onto the equipment plinths and terminated at the wall bases and around every pipe penetration, with the plant left in place throughout.

Setting
Mechanical room
Detail
Broadcast traffic coating
See the photographs →
Downtown Vancouver

Sutton Place Hotel ramp

A failed ramp membrane on a live hotel, where closing valet access during the day was never an option. Worked overnight in phases, with the ramp handed back operational every morning.

Area
8,400 ft²
Detail
TUE-FC
Burnaby

Commercial parkade, four levels

The largest phased project we have delivered: membrane replacement and structural repair across four levels of an occupied parkade, with no full closure at any point.

Area
50,000 ft²
Detail
4 phases
Richmond

Distribution warehouse floor

High-build epoxy over a slab with elevated vapour transmission on the Fraser delta. Moisture readings drove the specification to a vapour-tolerant build before anything was ordered.

Area
30,000 ft²
Detail
EWS
North Vancouver

Strata roof deck

Exposed roof deck taking salt air off the inlet. Specified as a fully aliphatic build to hold colour under ultraviolet and resist chloride ingress.

Area
12,000 ft²
Detail
TUE
Whistler

Resort parkade

De-icing salt and eighty-plus freeze–thaw cycles a season. Detailed for movement first: a membrane that stays flexible cold, with every joint and termination reworked.

Area
16,500 ft²
Detail
80+ cycles/yr
Richmond

Hotel parkade membrane

Membrane replacement across a hotel parkade kept fully operational throughout, sequenced around occupancy so guest parking was never unavailable.

Area
40,000 ft²
Detail
Phased
Seamless white resin floor running through a glazed office corridor at the Aritzia head officeHead office

Aritzia head office

An office fit-out where one floor runs from the glazed office corridor through open-plan desking and into the staff cafeteria. A single continuous surface across three very different rooms, which is what keeps a large floor plate reading as one space instead of a patchwork of finishes.

Setting
Head office
Finish
Seamless resinous
Grey resinous floor with yellow aisle line marking in the MTU Canada parts and service areaParts and service

MTU Canada

A parts and service floor carrying racking, workbenches and daily pallet movement. Aisles and keep-clear zones are set out in line marking over the coating, so the traffic plan survives cleaning and wear rather than lifting at the edges.

Setting
Parts and service floor
Detail
Aisle line marking
Grey flake broadcast floor with an integral coved base in a service area at Ridge Meadows HospitalMaple Ridge

Ridge Meadows Hospital

A service area floor coated during a live refurbishment, with the ceiling grid still open and the building still running. The base is coved up the wall rather than finished against a separate skirting, so there is no joint at the floor-to-wall junction for water or cleaning chemistry to work behind.

Setting
Hospital service area
Detail
Integral coved base

From the field

Our own work, our own camera.

These are photographs from West Pacific job sites — not stock imagery. Full photo sets for any project type are available on request.

Seamless white resin floor through a glazed office corridor at the Aritzia head office
Aritzia head office — resin floor through the glazed corridor
Grey resinous floor with yellow aisle line marking, MTU Canada
MTU Canada — aisle line marking over the coating
Light resinous office floor with carpet inset under a run of desks, Aritzia head office
Aritzia head office — open-plan floor with carpet inset
Grey flake broadcast floor with an integral coved base, Ridge Meadows Hospital service area
Ridge Meadows Hospital — flake broadcast floor, coved base
Seamless white floor in the staff cafeteria at the Aritzia head office
Aritzia head office — staff cafeteria
Mazda Richmond Automall service shop after coating, light grey resinous floor under the hoist
Mazda Richmond Automall — service shop, after

Higher-resolution photography of recent parkade and membrane work is being shot now and will replace and extend this set.

Site assessments

Send us the slab. We'll tell you what it actually needs.

Photographs and a rough area are enough to start. We'll come out, test moisture, and scope it properly.

Main (236) 873-2580  ·  Second (604) 230-0256 ·  estimating@westpacificcoatings.com