Surrey · Since 2001
Epoxy and industrial floor coatings in Surrey.
Fast-growing industrial and warehouse floor area south of the Fraser, plus a rapidly expanding stock of newer residential parkades.
Surrey
Newer buildings, different problems

Much of Surrey's parkade stock is recent, which changes the conversation. Rather than replacing a thirty-year-old membrane, the common Surrey job is fixing a system that was installed within the last decade and has already failed — usually because preparation was inadequate, moisture was not tested, or the detailing at curbs and drains was rushed.
On the industrial side, Surrey and Cloverdale have a lot of newer warehouse floor area where the question is specification rather than repair: what coating survives the actual forklift traffic, and how fast can it be installed over a shutdown weekend.
Where a recent system has failed, it is worth knowing that a warranty may still be live. We can document the failure mode properly, which is what a manufacturer will want before honouring anything.
- Common work
- Early-failure remediation
- Industrial
- Warehouse and distribution
- Turnaround
- Shutdown weekends
Services
What we install in Surrey
Parkade waterproofing
Traffic-bearing membranes for Surrey parkades, ramps and roof decks.
Learn more →Local conditions
Surrey is where the region's floors are being built
Surrey is Metro Vancouver's growth engine, and its concrete is younger than the region's average — which changes the work. City Centre and Whalley are stacking towers over new parkades whose membranes are original and whose stratas are reaching their first depreciation-report cycles; Fleetwood and Clayton follow behind on the same curve. New does not mean exempt: the first membrane renewal on a twenty-year-old parkade is exactly when the structure is either protected for decades or quietly starts its chloride career.
The industrial side is the region's largest by land: Port Kells, Campbell Heights and the Newton and Bridgeview corridors carry distribution, manufacturing and food processing at a scale no other municipality matches, with new tilt-up going up continuously. New tilt-up slabs bring their own trap — construction moisture that has not finished leaving. A slab poured months ago can read far too wet to coat, and the schedule pressure to coat it anyway is precisely how new buildings get failing floors. Measured readings, not the occupancy date, decide when the floor goes down.
South Surrey and Grandview Heights add retail and commercial floors on the same growth curve, and the border-adjacent logistics parks keep forklift floors working around the clock.
Where the work is
First membranes and new industrial floors
The Surrey pattern: first-cycle parkade membrane renewals under the City Centre towers, planned with councils working through their first big capital project; industrial builds across Port Kells and Campbell Heights, from broadcast epoxy to urethane cement at the food plants; and new-construction floors where the honest answer is sometimes "not yet — the slab is still drying." What the readings mean is covered in the moisture testing guide; how first-time strata scopes get comparable bids is in the depreciation report guide.
The Langleys and Delta continue the same industrial belt and are covered on their own pages.
Questions
What Surrey clients ask us.
We are building new in Surrey. When should the coating go in?
Later than most schedules assume. Fresh concrete holds a lot of water, and coatings applied to a slab that has not dried enough will blister or debond. Rather than counting days, we test — an in-situ relative humidity reading tells you whether the slab is ready. On fast-track Surrey projects that test result is sometimes an unwelcome answer, and it is still cheaper than recoating a failed floor.
Surrey covers a big area. Do you work across all of it?
Yes, from Whalley and Guildford through Newton, Cloverdale and South Surrey, plus both the City and Township of Langley next door. The practical difference across that area is building stock rather than technique: newer strata towers in the north around City Centre, and more low-rise industrial and warehouse floors through Newton and Campbell Heights.
Can you coat a warehouse floor in stages as we fit out?
Yes, and on new industrial buildings that is often the sensible order — coat the open floor before racking goes in, then handle the remaining areas after fit-out. Coating around installed racking is possible but slower and produces more joints in the work. If your fit-out schedule is known, we will lay the phases out to minimise both.
What is the realistic lead time for a Surrey project?
It depends on season and scope, but the honest answer is that summer books up early, because everyone wants exposed deck work done in dry weather. Interior industrial floors have far more schedule flexibility since we control conditions inside. If you have a hard date, tell us at the enquiry stage rather than after the quote.
Site assessments
Have a slab in Surrey you're worried about?
Photographs and a rough area are enough to start. We'll come out, test moisture, and scope it properly.
Main (236) 873-2580 · Second (604) 230-0256 · estimating@westpacificcoatings.com